Control valves play a very important role in automatic control of modern chemical plants. The production of these plants depends on the correct distribution and control of the flowing medium. These controls...

Control valves play a very important role in automatic control of modern chemical plants. The production of these plants depends on the correct distribution and control of the flowing medium. These controls, whether the exchange of energy, the reduction of pressure, or the simple container feeding, require some final control elements to complete.

Belongs to the valve control valve, the main role is to adjust the parameters of the medium pressure, flow rate, temperature and so on, is the final process control elements in the loop. How to solve the problem of leakage of electric regulating valve

) 1 increase in seal oil method

Of electric control valve of unused oil seal, consider increasing the seal fat to improve the performance of stem seal.

2) increase the packing method

To improve the packing of the valve stem sealing performance, can be used to increase packing method. It is usually used in the form of double layer and multi-layer mixed packing, which increases the quantity simply, such as adding 3 pieces to 5 pieces, and the effect is not obvious.

3) the replacement of graphite packing method

The extensive use of PTFE packing, its operating temperature range of -20 to 200 DEG C, when the temperature in the upper and lower limits, change is large, the seal will be significantly decreased, aging fast, short life. Flexible graphite filler can overcome these shortcomings and have long service life. Therefore, some factories have changed the fillers of tetrafluoroethylene into graphite filler, and even the newly bought adjustment valves also replace the tetrafluoro fillers into graphite fillers. However, the use of graphite filler has a large back difference and some creeping phenomena at the beginning, which must be considered.

4) a change in the flow, put the P2 in the stem end method

When P is large, P1 and P1 than the larger, seal seal P2 difficult. Therefore, can be used to change the flow of the P1 to P2 in the stem end of the stem end, which is high pressure, great pressure valve is more effective. Such as bellows valve should normally be considered seal P2.

5) using lens pad seal method

For the upper and lower lid seal, the sealing seat and the upper and lower body. If it is a plane sealing under high temperature and pressure, the sealing is poor, causing leaks, you can use the lens pad seal, to get satisfactory results.

6) replacement gasket

So far, most still use asbestos gasket under high temperature, poor sealing performance, life expectancy is short, causing leaks. In this case, the winding gasket, the "O" ring, and so on, are now used in many factories.

主站蜘蛛池模板: 亚洲在线观看 | 日韩在线精品视频 | 亚洲激情视频在线 | 91亚瑟视频 | 噜噜操 | 国产在线麻豆自在拍91精品 | 久久精品久久精品久久精品 | 欧美三级黄视频 | 麻豆果冻传媒新剧国产短视频 | 日本大片成人免费播放 | 91黑丝在线| 国内精品久久久久久久久久久久 | 爱爱视频网站免费 | 日韩不卡毛片 | 午夜a级理论片在线播放一级 | 午夜精品久久久久久99热 | 久久综合久久综合久久综合 | 扒开双腿猛进入爽爽在线观看 | 伊人久久亚洲精品一区 | 狠狠色噜噜狠狠狠狠黑人 | 免费国产99久久久香蕉 | 国产免费久久精品99久久 | 天天爱天天干天天操 | 全部免费的毛片在线看美国 | 99在线精品视频在线观看 | 欧美日韩在线一区二区三区 | 九九热精彩视频 | 日韩黄色成人 | 99精品视频在线观看 | 免费人成在线 | 国产亚洲精品免费 | 一区二区三区无码高清视频 | 免费看美女逼逼 | 免费在线a视频 | 模特视频一二三区 | 久久久久久综合成人精品 | 日本一区二区视频在线 | 日韩欧美精品一区二区 | 91女神在线 | 国产精品久久99 | 久久国产精品一国产精品 |