Installation of electric regulating valve precautions

Column:Technical article Time:2017-12-08
Installation of electric regulating valve precautionsElectric regulating valve installation should pay attention to the following aspects:1, the control valve should be installed before the pipeline cleaning...

Installation of electric regulating valve precautions


Electric regulating valve installation should pay attention to the following aspects:


1, the control valve should be installed before the pipeline cleaning, remove dirt and welding slag. After installation, in order to ensure that no impurities remain in the valve body, the valve should also be cleaned again, that is, when the medium should be opened so that all valves open to prevent impurities stuck. After using the hand wheel mechanism, should be restored to the original neutral position.


2, the control valve should generally be mounted vertically, under special circumstances can be tilted, such as the tilt angle is very heavy valve itself should be increased when the support valve protection.


3, the implementing agencies reducer after repair should pay attention to refueling lubrication, low-speed motor generally do not demolition and refueling. Assembly should also check the valve position and valve position opening instructions are consistent.


4, the control valve is a field instrument, requiring ambient temperature should be -25 ~ 60 ℃ range, relative humidity ≤ 95%. Is to install outdoor or high temperature occasions, should take waterproof, cooling measures. A source side to stay away from the vibration source or increase the anti-vibration measures.


5, electric regulating valve electrical part of the installation should be related to electrical equipment construction requirements. In the case of explosion-proof products, they should be installed in accordance with the "Installation Specification for Electrical Equipment in Explosion Hazardous Locations". Such as the scene wire SBH or other six-core or eight core, outer diameter of about Φ11.3mm rubber skin to install cable. Use and maintenance, explosion-proof area is strictly prohibited open cover maintenance and prying open the explosion-proof surface. At the same time do not disassemble knock or injury flameproof surface, after the repair to restore the original flameproof state.


6, the control valve failure or repair of the production process can continue, the control valve should be added bypass pipeline. At the same time should also pay special attention to whether the valve installation position meets the process requirements.


7, the installation of control valve pipe generally not from the surface or plate is too high, the pipe height is greater than 2m should be set as the platform, in order to facilitate the operation of the hand wheel and easy maintenance.



主站蜘蛛池模板: 97精品国产综合久久久久久欧美 | 日韩欧美激情 | 日日夜夜2017 | 成人在线免费观看视频 | 高清国产在线观看 | 亚洲欧美日产综合在线看 | 国产精品久久久 | 国产日产欧产精品网站 | 哚哚影视理论片第三页 | 91人成亚洲高清在线观看 | 久久国产亚洲 | 欧美一级毛片在线观看 | 久久七国产精品 | 性夜影院爽黄a爽免费视 | 天天操天天摸天天舔 | 国产成人高清在线 | 精品国产品欧美日产在线 | 色综合综合色综合色综合 | 在线观看欧美国产 | 久久成人福利视频 | 久久手机精品视频 | 国产精品无 | 日本插插视频 | 久久爱台湾佬中文娱乐 | 日本网络视频www色高清免费 | 久久亚洲私人国产精品 | 亚洲成人网在线 | 日韩另类 | www一区二区 | 天天射夜夜骑 | 国产chinese91在线 | 小优视频污 | 91九色在线播放 | 久久精品国产福利国产秒 | 久久狠狠一本精品综合网 | 99久久国产免费 - 99久久国产免费 | 岛国在线免费 | 国产成人在线免费 | 欧美日韩国产在线成人网 | 色综合久久久久久888 | 久久99久久精品免费思思 |