Installation of electric regulating valve precautionsElectric regulating valve installation should pay attention to the following aspects:1, the control valve should be installed before the pipeline cleaning...

Installation of electric regulating valve precautions


Electric regulating valve installation should pay attention to the following aspects:


1, the control valve should be installed before the pipeline cleaning, remove dirt and welding slag. After installation, in order to ensure that no impurities remain in the valve body, the valve should also be cleaned again, that is, when the medium should be opened so that all valves open to prevent impurities stuck. After using the hand wheel mechanism, should be restored to the original neutral position.


2, the control valve should generally be mounted vertically, under special circumstances can be tilted, such as the tilt angle is very heavy valve itself should be increased when the support valve protection.


3, the implementing agencies reducer after repair should pay attention to refueling lubrication, low-speed motor generally do not demolition and refueling. Assembly should also check the valve position and valve position opening instructions are consistent.


4, the control valve is a field instrument, requiring ambient temperature should be -25 ~ 60 ℃ range, relative humidity ≤ 95%. Is to install outdoor or high temperature occasions, should take waterproof, cooling measures. A source side to stay away from the vibration source or increase the anti-vibration measures.


5, electric regulating valve electrical part of the installation should be related to electrical equipment construction requirements. In the case of explosion-proof products, they should be installed in accordance with the "Installation Specification for Electrical Equipment in Explosion Hazardous Locations". Such as the scene wire SBH or other six-core or eight core, outer diameter of about Φ11.3mm rubber skin to install cable. Use and maintenance, explosion-proof area is strictly prohibited open cover maintenance and prying open the explosion-proof surface. At the same time do not disassemble knock or injury flameproof surface, after the repair to restore the original flameproof state.


6, the control valve failure or repair of the production process can continue, the control valve should be added bypass pipeline. At the same time should also pay special attention to whether the valve installation position meets the process requirements.


7, the installation of control valve pipe generally not from the surface or plate is too high, the pipe height is greater than 2m should be set as the platform, in order to facilitate the operation of the hand wheel and easy maintenance.



主站蜘蛛池模板: 亚洲日本久久一区二区va | 爱爱视频在线看 | 久久官网 | 人人澡人人添 | 艹逼视频免费观看 | 成人私拍福利视频在线 | 91孕妇精品一区二区三区 | 久久婷婷综合中文字幕 | 中文字幕免费在线播放 | 99这里只有精品在线 | 国产美女久久久久久久久久久 | 国产高清色播视频免费看 | 啪啪99久久综合精品色 | 日日操夜夜爽 | 国产国拍亚洲精品mv在线观看 | 日韩经典第一页 | 性欧美videos喷潮孕妇 | 国产精品99久久久久久董美香 | 国产99在线 | 手机看片久久高清国产日韩 | 麻豆国产一区二区在线观看 | 国产一区二区三区欧美 | 午夜资源站 | 国产精品欧美一区二区三区不卡 | 日韩一区二区三区精品 | 乱码亚洲一区二区三区 | 日日干夜夜艹 | 国产亚洲一区在线 | 亚洲精品一区二区三区不卡 | 日韩在线高清视频 | 思思久久96热在精品国产10 | 在线观看xxxxvideo | 91色视| 久久国产热这里只有精品8 久久国产三级 | 日韩欧美综合在线 | 日韩精品永久免费播放平台 | 国产亚洲欧洲一区二区三区 | 亚洲精品欧美 | 天天摸天天做天天爽 | 日本一级毛片一级裸片 | 日本黄色免费网站 |