Installation of electric regulating valve precautions

Column:Technical article Time:2017-12-08
Installation of electric regulating valve precautionsElectric regulating valve installation should pay attention to the following aspects:1, the control valve should be installed before the pipeline cleaning...

Installation of electric regulating valve precautions


Electric regulating valve installation should pay attention to the following aspects:


1, the control valve should be installed before the pipeline cleaning, remove dirt and welding slag. After installation, in order to ensure that no impurities remain in the valve body, the valve should also be cleaned again, that is, when the medium should be opened so that all valves open to prevent impurities stuck. After using the hand wheel mechanism, should be restored to the original neutral position.


2, the control valve should generally be mounted vertically, under special circumstances can be tilted, such as the tilt angle is very heavy valve itself should be increased when the support valve protection.


3, the implementing agencies reducer after repair should pay attention to refueling lubrication, low-speed motor generally do not demolition and refueling. Assembly should also check the valve position and valve position opening instructions are consistent.


4, the control valve is a field instrument, requiring ambient temperature should be -25 ~ 60 ℃ range, relative humidity ≤ 95%. Is to install outdoor or high temperature occasions, should take waterproof, cooling measures. A source side to stay away from the vibration source or increase the anti-vibration measures.


5, electric regulating valve electrical part of the installation should be related to electrical equipment construction requirements. In the case of explosion-proof products, they should be installed in accordance with the "Installation Specification for Electrical Equipment in Explosion Hazardous Locations". Such as the scene wire SBH or other six-core or eight core, outer diameter of about Φ11.3mm rubber skin to install cable. Use and maintenance, explosion-proof area is strictly prohibited open cover maintenance and prying open the explosion-proof surface. At the same time do not disassemble knock or injury flameproof surface, after the repair to restore the original flameproof state.


6, the control valve failure or repair of the production process can continue, the control valve should be added bypass pipeline. At the same time should also pay special attention to whether the valve installation position meets the process requirements.


7, the installation of control valve pipe generally not from the surface or plate is too high, the pipe height is greater than 2m should be set as the platform, in order to facilitate the operation of the hand wheel and easy maintenance.



主站蜘蛛池模板: 91极品反差婊在线观看 | 欧美另类杂交a | 日本精品久久久一区二区三区 | 日本一区二区视频在线 | 亚洲 成人 欧美 自拍 | 国内精品久久久久影院日本 | 91热成人精品国产免费 | 中文字幕久久久久久精 | 亚洲欧美日韩国产一区图片 | 手机看片久久高清国产日韩 | 日韩在线视频观看 | 99热久久这里只有精品7 | 欧美高清videossexo成熟 | 精品久久免费观看 | 精品国产理论在线观看不卡 | 亚洲日本va在线观看 | 在线国产一区二区 | 亚洲三级在线视频 | 国产精品99久久久久久宅男 | 久久精品视频一区 | 91精品国产高清久久久久久io | 亚洲一区 欧美 | 综合五月天堂 | 国产拍拍视频一二三四区 | 中文字幕一区二区三区四区五区人 | 亚洲人xxx日本人18 | 黑丝呻吟 | 精品国产无限资源免费观看 | 在线视频一区二区三区 | 国产成人午夜精品免费视频 | 国产三级日本三级日产三级66 | 精品国产一区二区二三区在线观看 | 成人精品视频 | 91欧美激情一区二区三区成人 | 天天综合亚洲 | 欧美成人精品一区二区三区 | 色老头久久久久久久久久 | 九色最新 | 久久成人福利视频 | 亚洲一区综合在线播放 | 精品亚洲一区二区 |